MGGS Summer Works!
This summer our summer works included:
- Preliminary works for new building
- New windows at the front of C Block which completes our window replacement programme
- Geography Corridor and C Block lift lobby have been redecorated
- Blind replacements – all old beige ones now replaced with blue ones
- Double gates installed at other end of tennis courts
- Cabled, installed and configured 84 new IP sounders to replace the bell system and a microphone and call buttons including indoor and outdoor speakers installed for full coverage of the school site
- Installed and configured 4 new network switches and replaced one of our data cabinets. Relocated 4 existing switches to other locations
- Installed 7 new Promethean Interactive Touchscreens
- Lots of redundant equipment sent off for recycling
- More CCTV cameras installed!
- New PCs setup and installed for the Art Department in B202
- 321 Chromebooks Delivered – thank you everyone who helped carry them up the stairs! All sorted into form groups ready to distribute and lots of rubbish to dispose of.
Great job by our Site & Network Teams!